About Rampart About Rampart
Remodeling Remodeling
New Homes New Homes
New Homes Real Estate
Communities Communities
Articles Articles
Associates Associates
Organizations Organizations
Salter House Salter House
Testimonials Testimonials
Contact Us Contact Us
Privacy Policy Privacy Policy
Home Page Home Page


Rampart Homes, Inc. Sarasota, Florida

(941) 925-4835

4401-E Ashton Road, Sarasota, Florida 34233


CRC 045814
RE BK Lic. 0403858


Copyright 2001,
2002 & 2003
Rampart Homes Inc.
All rights reserved. 

No part of this
website may be reproduced without permission.


Articles


"Design Analysis Agreement"

~ Preliminary Design Analysis - scope of work and specifications with conceptual budgeting

~ Rampart Homes and the design professionals will consult with the local building department officials, if necessary, for conceptual budgeting purposes.

~ Meet with key subcontractors at site, as needed, to discuss project details.

~ Meet with structural engineer, as needed, to discuss structural preliminary details.

~ Meet with environmental engineering (reference septic tank) to determine current health department requirements and environmental engineering cost for analysis and drawings. (approximate range of cost $350 to $600 depending on scope)

~ Prepare a product selection manual.

~ Final design - Help finalize working drawings (drawings to be used for actual construction and accepted by the local building department). This also includes final structural engineering and site engineering, if necessary.

Note: Clients are directly responsible for design fees to the design professional or architect.  Clients are directly responsible for environmental engineering fees.  Rampart Homes Design review fee is 2% to 5% of the projected value of the project (scope of work)

 

About Rampart ~ Remodeling ~ New Homes ~ Communities ~ Articles ~ Associates
Organizations ~ Salter House ~ Testimonials ~ Contact Us ~ Privacy Policy ~ Home Page